When a Winnellie company needed to get more space out of their existing commercial warehouse, they contacted Semcorp for the solution. The Semcorp team installed a full-length mezzanine floor, with steel construction and timber flooring, and built an air-conditioned office, with stair access at one end of the new mezzanine.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed